Chittranjan Locomotive

Context and the brief

For Kamal Enterprise at the GM Building Conference Hall, Chittranjan, West Bengal, IQUBX supplied and installed the WP01P partition system across approximately 3,000 sq ft. The project was completed in 2024, with Amrish Kumar Das as the architect/interior designer and Mr. Bapi, Kamal Enterprise as the PMC.

The project required a new partition system to be installed without removing or damaging the existing walls or partitions. This helped avoid major civil work and minimize disruption to the existing space.

The installation also needed to be fast and clean, with minimal site disturbance and no visible nails or exposed fixings. The finished solution was expected to provide a professional and refined appearance while remaining adaptable for future space requirements.

Project at a glance

DetailsInformation
Client / End UserKamal Enterprise
LocationChittranjan, West Bengal
SectorGovernment
Building TypeGM Building Conference Hall
Architect / Interior DesignerAmrish Kumar Das
PMCMr. Bapi, Kamal Enterprise
System InstalledWP01P
Panel MaterialPrelam Board
Panel Thickness12 mm
Area Installed3,000 sq ft
Installation Duration15–18 days
SupplyDirect
Completed2024

IQUBX Solution

Three priorities shaped the specification

Installation Without Demolition

The client required a new partition system that could be installed without removing or damaging the existing walls or partitions. The IQUBX solution helped avoid major civil work while minimizing disruption to the existing space.

Fast & Clean Installation

The solution needed to be installed quickly with minimal site disturbance. The installation was designed to maintain a neat and clean appearance without visible nails or exposed fixings, helping create a more professional and refined space.

Professional Finish with Future Flexibility

The modular partition system provided a premium finished look while allowing the partitions to be dismantled, reconfigured or relocated in the future as space requirements change.

The finished space

Placeholder photography — swap in real site images when available

Outcome

A full corporate fit-out delivered in 8–10 days on a live site, with a seamless wood-grain finish, no visible fixings, and a partition system Hans Business Park can dismantle and relocate whenever its space needs change.